pictures of the current state of the building

 

Shutter door and slide panel in the closed position
Shutter door and slide panel in the open position
two very ugly welded tools to carry the building,  the bits of wood protect the outside of the building, and stop the tools from wobbling sideways. The hook part goes under the building and the top part is about 1mtr above the bottom edge, making it easy to lift the building

 

Dec 04 flow coating the top.
Dec 04 flow coating the top. 

In the background the main building already flow coated and the freshly laminated shutter door and entry door

 

The lower building and door, seen from the front
the ply rings and verticals, the top area has no rings as that is where the steel tube ring runs on the wheels

Strange things going on in front of the workshop.

In order to carry on even during rain a shelter is build, and this is how it looks during the night

Frame of the top, finished, awaiting the skin to be glued on the next day

The rectangular ply sheets on the sides, are there to give the frame strength during the fitting of the skin 

 

A lot of compound angles going here, hence the belt sander to tweak the joints 

Skin fitted, for those who want to know 12mm ply !! that takes some doing.

 

Next job the roof

Did I mention the Rain ? well 3 days in a row,  and although I have a tent build, the water coming of the roof turns the clay  ground into a skating rink

 

 

Something from space ?

The roofed top part sheltering from rain and storm

Another late night picture. the top opening is now finished and side panels fitted. still need to sand of the edges.

next step the door