 |
 |
 |
 |
 |
 |
 |
 |

|
Shutter
door and slide panel in the closed position |
Shutter
door and slide panel in the open position |
two very ugly welded tools to
carry the building, the bits of wood protect the outside of
the building, and stop the tools from wobbling sideways. The hook part
goes under the building and the top part is about 1mtr above the
bottom edge, making it easy to lift the building
|

|
|
Dec
04 flow coating the top. |
Dec
04 flow coating the top.
In the background the main building already
flow coated and the freshly laminated shutter door and entry door
|
|
The
lower building and door, seen from the front |
the
ply rings and verticals, the top area has no rings as that is where
the steel tube ring runs on the wheels |
|
|
|
|
Strange
things going on in front of the workshop.
In
order to carry on even during rain a shelter is build, and this is
how it looks during the night |
Frame of the top, finished, awaiting the
skin to be glued on the next day
The rectangular ply sheets on the sides, are
there to give the frame strength during the fitting of the
skin
A lot of compound angles going here, hence
the belt sander to tweak the joints |
Skin
fitted, for those who want to know 12mm ply !! that takes some
doing.
Next job the roof |
Did
I mention the Rain ? well 3 days in a row, and although I have
a tent build, the water coming of the roof turns the clay
ground into a skating rink
|
Something
from space ?
The roofed top part sheltering from rain and
storm |
Another
late night picture. the top opening is now finished and side panels
fitted. still need to sand of the edges.
next step the door |
|