02/01/2007 |
|
|
|||||||||||||
Toby Family Website
http//fp.tobyfam.plus.com |
|
||||||||||||||
|
|
|
Observatory To Do |
||||||||||||
|
|
||||||||||||||
To-do listlast update 02/01/2007 Lower Building
Rotating Top building
Track (1880mm version)
Shutters Draw up detailed design for top shutter Draw up detailed design for lower
shutter Control Relay and control part halted awaiting
new control design Electrics Project halted awaiting new control
design, original needs to be ripped out Altitude hinge point has play radial to the bold. this is due to cheap manufacturing,when adjusting the up/down screw things move up/don in the play before movign the head. This will need a custom bold to be turned and a bush fitted in the RA part of the mount. General overhaul and cleaning of bearing
surfaces, as per several websites. modification of the stepper drive to direct belt drive, as the current gears are way to sloppy
|
|||||||||||||||